Who it's for

Built for mid-market manufacturers stuck between paper and a $1M SI quote.

  • Currently runs work orders on paper, printed travelers, or Excel
  • Has an ERP (SAP, Dynamics, Infor, NetSuite) that's the system of record
  • 1–5 production sites, 50–500 operators on the floor
  • OEM customer pressure for real-time traceability or production reporting
Manufacturing Plant
Replace with photography
Scope by week

What's in the sprint, week by week.

  • Weeks 1–2: Floor walk, process mapping, ERP API audit, tech stack decision
  • Weeks 3–5: Build digital work-order app (mobile + tablet), MQTT-to-ERP integration, role-based access
  • Week 6: User acceptance testing on 1 line / cell
  • Week 7: Rollout to remaining lines + operator training
  • Week 8: Go-live + 1 week post-go-live support
Deliverables

What you walk away with

  • Live digital work-order system on the shop floor
  • Operator app (mobile + tablet) with offline-first behavior
  • Supervisor real-time dashboard
  • Bidirectional integration with your ERP
  • Training materials + 1-day operator workshop
  • 30-day post-launch SLA
Tech stack

How we build it

  • Frontend: React + Capacitor (iOS/Android mobile)
  • Backend: Node.js or .NET
  • Database: PostgreSQL
  • Integration: REST + MQTT, Kafka where needed
  • Hosting: AWS or Azure
  • Identity: Auth0 / Microsoft Entra

Typical payback: 6–9 months from supervisor time savings alone.

Discovery is a 30-minute structured conversation. No pitch. No slides.

Book a Shop Floor Audit